6 November 2026 · 5 min read
The Timetable Builds. But Is It a Good One?
The timetable is built and pinned on the board. By lunch the first complaint arrives. No clashes, yet it isn't a good timetable. Here is what Atlas does at that point.
The first Monday of September. The timetable is finally built and pinned on the staff-room board. By lunch the first complaint arrives: “I teach period 1 on Tuesday, then nothing until period 6.” Then the second: “6-A has maths, physics and chemistry back to back on Thursday.”
Did the timetable build? Yes. Any clashes? None. Is it a good timetable? No.
In most schools this is where the manual work starts again. You move a lesson and a new problem appears somewhere else. You fix that and another teacher objects. We built Atlas so that it does not stop at this point.
A good timetable starts by splitting the rules in two
Not every request written into a timetable carries the same weight. Some are not negotiable: a teacher cannot be in two classrooms at once, and a teacher who is unavailable on Friday cannot teach on Friday. Others are “nice to have”: keep a teacher's idle hours low, put heavy subjects in the morning.
In Atlas the first kind is a required rule and the second a preference. A required rule is never broken. Preferences Atlas meets as far as it can. Each preference gets a Low, Medium or High priority; when two preferences pull against each other, Atlas protects the higher one more strongly. Some of the preferences schools use most:
- “Keep a teacher's idle hours low”
- “Schedule heavy subjects earlier in the day”
- “Don't put heavy subjects back-to-back”
- “Don't pile heavy subjects on one day”
- “Keep one day free for a teacher”
- “Spread a lesson evenly across the week”
The first timetable is not the finish line
Atlas first places every lesson within the required rules. It does not stop there. It keeps improving that same timetable against your preferences. After you press Generate Timetable, this is the stage where the screen reads “Searching for the best placement and refining it”. If moving a lesson closes a teacher's idle hour and breaks no required rule, Atlas makes that move.
What you get at the end is not a single “done”. The screen shows three numbers: Placed lessons, Fully met and Room to improve. So the moment the timetable is in your hands, you know how many of your preferences were met in full and how many still have room to improve.
An unmet preference comes with the arithmetic
Not every preference can be met in full at every school. What matters is knowing it and seeing why. Atlas's Analysis lists your preferences one by one. Next to any that falls short, it names the classes and teachers affected.
In some cases Atlas goes one step further and shows you the arithmetic. At a school that teaches five days a week, for a class with 12 heavy lessons, the screen reads:
“6-A has 12 heavy lessons. With a preference of at most 2 a day, 10 of them can stay inside that target across the week. Meeting this preference in full is therefore not possible with the current lesson load.”
Right below it, what would change that: “Meeting it in full would need this limit to be at least 3.” However the timetable is arranged, this result stays the same. It is not a guess, it is arithmetic. Atlas only says this when it can prove it. Where it cannot, it says nothing; a wrong “impossible” costs more than an unmet preference.
The same notice also appears before you build. If you see “Some preferences may not be fully met, given the current lesson plan.” above the Generate Timetable button, you can review your weekly hours or the preference first. The notice does not stop the build. The decision is yours.
Improving does not mean starting over
The timetable is live and teachers are used to it. Then you change a preference or add a new one. Rebuilding from scratch would scatter the arrangement everyone has settled into. Optimize improves the timetable while keeping your current arrangement as much as possible. Locks are hard, and your hand placements are kept strongly.
When it finishes, Atlas tells you plainly what it did. For example: “12 lessons moved, 228 stayed; locks kept: 6.” If you would rather see a completely different arrangement, Create new alternative builds a separate timetable without touching your working draft.
Not artificial intelligence: arithmetic
We are often asked whether Atlas does this with AI. It does not. Atlas does not have a chat model write your timetable. It builds the timetable with mathematical constraint programming and optimization. For your school that has two concrete results: required rules are never broken, and the same data always gives the same timetable.
Back to the timetable on the board
Remember the two complaints from that Monday in September. In Atlas the first is the preference “Keep a teacher's idle hours low”, the second is “Don't put heavy subjects back-to-back”. Atlas works to improve both. If it cannot meet them in full, it tells you in which class and for which teacher, and where it can, why. Before the timetable reaches the board.
A good timetable is one without clashes. But that is not all it is. It also takes a teacher's day and a student's tiredness into account. That is what we build Atlas for.
If the timetable will not build at all, we covered that in When the timetable won't build. For planning a teacher's day off, see this post; for changing a live timetable without clashes, see this one.
Frequently asked
What is the difference between a required rule and a preference?
A required rule is never broken; a teacher's unavailable hours are an example. A preference is “nice to have”: Atlas meets it as far as it can and, when preferences conflict, protects the higher-priority one more strongly.
How does Atlas know a preference cannot be met?
For some preferences it works it out from the lesson load: if a class's weekly heavy lessons exceed the daily limit times the number of days, the preference cannot be met in full. Atlas says so only when it can prove it. For the others it shows where the preference fell short and who it affects.
Does Optimize rebuild the timetable from scratch?
No. Optimize improves the timetable while keeping the current arrangement as much as possible; locks are hard and hand placements are kept strongly. For a completely different timetable, use Create new alternative.